| G10 |
| 650 |
SITE PAINTING OF CAST IRON WITH TWO PACK EPOXY ZINC PHOSPHATE AND A URETHANE INTERMEDIATE & FINISH COAT |
|
| Life to first Maintenance: |
Up to 20 years in a C2 Environment |
| Use/location |
Internal exposed cast iron in a semi controlled environment requiring a decorative finish |
| Paint manufacturer |
Leighs Paints, Tower Works, Kestor Street, Bolton BL2 2AL Tel: +44(0)1204 521771   Fax: +44 (0)1204 534015 |
| Site preparation |
Blast cleaning to BS EN ISO 8501-1:2001, preparation grade Sa2½. Average surface profile in the range 50 - 75 microns |
Site primer - Dry film thickness - Colour - Special requirements |
Epigrip L425HS Zinc phosphate primer 50 microns as defined in BS EN ISO 12944-5 Limited range of primer shades Stipple by brush |
Site intermediate Coat - Dry film thickness - Colour |
Resistex C237 Undercoat/sheen finish 50 microns nominal as defined in BS EN ISO 12944-5 As required by the architect |
Site Top coat - Dry film thickness - Colour - Special requirements |
Reistex C137V2 Gloss finish 50 microns nominal as defined in BS EN ISO 12944-5 As required by the architect Alternatively Resistex C237 sheen finish can be specified |